Critical Path Institute in Florida

Critical Path Institute has 3 H-1B filings in Florida with $135,000 avg salary. 100% approval rate. Top roles: Senior Scientific Director, Sr.

Critical Path Institute has filed 3 H-1B petitions in Florida, with an average salary of $135k. The most common roles are Senior Scientific Director (67%), Sr. Scientific Director (33%). 100% of petitions were certified, with an average processing time of 7 days.

3
Filings
$135k
Avg Salary
100%
Approval Rate

Salary Statistics

Total Filings3
Approval Rate100%
Average Salary$135,000
Median Salary$135,000
25th Percentile$135,000
75th Percentile$135,000
Minimum Salary$135,000
Maximum Salary$135,000

Prevailing Wage Analysis

100% of filings offer salaries above the prevailing wage, with an average premium of 47.3%. The average prevailing wage is $92k (based on 3 filings with prevailing wage data).

Processing Time

Average processing time is 7 days (median: 7 days). Fastest: 7 days, slowest: 7 days. Based on 3 filings.

Workforce Insights

0% of filings are for new positions, while 33% are for continued employment (3 filings with data).

Average contract duration: 29 months (median: 36 months), based on 3 filings.

Education Requirements

Education LevelFilings
Not Specified3

Top Job Titles

Job TitleFilings
Senior Scientific Director2
Sr. Scientific Director1

Recent Filings

Senior Scientific Director
$135k · Certified
Senior Scientific Director
$135k · Certified
Sr. Scientific Director
$135k · Certified

Frequently Asked Questions

How many H-1B jobs does Critical Path Institute have in Florida?

Critical Path Institute has 3 H-1B filings in Florida in our database of DOL public records.

What is Critical Path Institute's average salary in Florida?

The average H-1B salary at Critical Path Institute in Florida is $135,000, with a median of $135,000. Salaries range from $135,000 to $135,000.

What is Critical Path Institute's H-1B approval rate in Florida?

Critical Path Institute's H-1B approval rate in Florida is 100% based on 3 DOL filings.

Critical Path Institute Jobs in Florida

Explore More

Immigration Guides