WITHDRAWN H-1B FY 2022

Senior Process Systems/Project Engineer

Bechtel Energy Inc. · Houston, Texas

Case #I-200-22157-249853

In FY2022, Bechtel Energy Inc. sought H-1B sponsorship for a Senior Process Systems/Project Engineer in Houston, Texas at $107k per year, which is 0% above the prevailing wage of $107k. The case was processed in 0 days during the FY FY2022 cycle. This position is for new employment.

$107k
Annual Salary
$107k
Prevailing Wage
0.0%
Wage Premium
1
Positions

Filing Details

Case NumberI-200-22157-249853
Case StatusWithdrawn
Visa ClassH-1B
Fiscal YearFY 2022
EmployerBechtel Energy Inc.
Employer LocationHouston, Texas
Job TitleSenior Process Systems/Project Engineer
SOC Code17-214100 – Mechanical Engineers
WorksiteHouston, Texas
Annual Wage$107k
Prevailing Wage$107k
Wage Premium0.0%
Positions1 (1 new, 0 continued)

Timeline

Jun 6, 2022
Received
Jun 6, 2022
Decision
Oct 1, 2022
Employment Start
Sep 30, 2025
Employment End

More Filings from Bechtel Energy Inc.

Job TitleSalaryStatusDate
Facility Operations / Operational Readiness Deputy $204k CERTIFIED Sep 12, 2025
Field Engineer - Instrumentation $145k CERTIFIED Aug 13, 2025
Inventory Specialist $121k CERTIFIED Aug 8, 2025
Inventory Supervisor $135k CERTIFIED Jul 23, 2025
CSU - Startup Manager “ LNG $240k CERTIFIED Jul 21, 2025

View all Bechtel Energy Inc. filings →

Explore More

About This H-1B Filing

This Labor Condition Application (LCA) was filed by Bechtel Energy Inc. for the position of Senior Process Systems/Project Engineer in Houston, Texas. The offered annual salary is $107k, compared to the prevailing wage of $107k for this occupation and location. This represents a wage premium of 0.0% above the prevailing wage.

The LCA is the first step in the H-1B visa process. Employers must file an LCA with the Department of Labor certifying that they will pay the foreign worker at least the prevailing wage for the occupation in the area of intended employment. A certified LCA is required before the employer can file an H-1B petition with USCIS.

Case status: Withdrawn. This means the employer or their representative withdrew the application.

Understanding This LCA Filing

A Labor Condition Application (LCA) is a mandatory document that U.S. employers must file with the U.S. Department of Labor (DOL) before they can petition for a foreign worker under the H-1B, H-1B1, or E-3 visa categories. The LCA process was established under the Immigration and Nationality Act (INA) to protect both foreign and domestic workers by ensuring fair wages and working conditions.

Why Employers File LCAs

When a U.S. company identifies a foreign national to fill a specialty occupation position, they must first obtain DOL certification through the LCA process before filing the H-1B petition (Form I-129) with U.S. Citizenship and Immigration Services (USCIS). In this case, Bechtel Energy Inc. filed LCA case number I-200-22157-249853 to sponsor a Senior Process Systems/Project Engineer position at their worksite in Houston, Texas. By filing this LCA, the employer attests to four key conditions: (1) paying the higher of the actual wage or prevailing wage, (2) providing working conditions that will not adversely affect other similarly employed workers, (3) no strike or lockout at the worksite, and (4) providing notice of the filing to the bargaining representative or posting notice at the worksite.

What Wage Levels Mean

The DOL establishes four wage levels for each occupation and geographic area, representing the progression from entry-level to fully competent workers:

For this filing, the offered wage of $107k compares to the DOL prevailing wage of $107k for Mechanical Engineers positions in the Houston, Texas area. The positive wage premium of 0.0% indicates the employer is offering above the DOL-determined average for this occupation and location.

What is Prevailing Wage?

The prevailing wage is the average wage paid to similarly employed workers in a specific occupation in the area of intended employment. The DOL determines prevailing wages using data from the Occupational Employment and Wage Statistics (OEWS) survey conducted by the Bureau of Labor Statistics (BLS). Employers must pay H-1B workers the higher of the prevailing wage or the actual wage paid to other employees in similar positions at the company. This requirement is designed to prevent employers from using H-1B workers to undercut domestic wages.

How to Interpret This Data

What Withdrawn Means for This Application

A "Certified-Withdrawn" status means this LCA was initially certified by the DOL but was later withdrawn by the employer. This can happen for various reasons: the foreign worker may have declined the position, found employment elsewhere, the employer may have decided to refile with updated information, or business conditions may have changed. A withdrawal does not negatively affect the employer's ability to file future LCAs.

Comparing to Industry Standards

The offered salary of $107k for this Senior Process Systems/Project Engineer position provides a data point for evaluating compensation trends in H-1B visa sponsorship. When reviewing H-1B salary data, consider that wages vary significantly based on geographic location, employer size, industry sector, and the worker's experience level. This position falls under SOC code 17-214100 (Mechanical Engineers), which standardizes how the Bureau of Labor Statistics classifies occupations across industries. Metropolitan areas like New York, San Francisco, and Seattle typically command higher salaries due to higher costs of living, while positions in smaller markets may offer lower nominal wages but comparable purchasing power.

Frequently Asked Questions

What is the salary for this Senior Process Systems/Project Engineer position?

The offered annual salary for this Senior Process Systems/Project Engineer position at Bechtel Energy Inc. is $107k. The Department of Labor prevailing wage for this occupation and location is $107k. The offered wage represents a 0.0% premium over the prevailing wage.

Where is this Senior Process Systems/Project Engineer job located?

This H-1B filing is for a position located in Houston, Texas. The employing company, Bechtel Energy Inc., is headquartered in Houston, Texas.

What visa type is this filing for?

This Labor Condition Application is filed under the H-1B visa classification. The H-1B visa is designed for specialty occupation workers who possess at least a bachelor's degree or equivalent in a specific field related to the job.

Who is the employer for this H-1B filing?

The employer for this filing is Bechtel Energy Inc., located in Houston, Texas. Bechtel Energy Inc. filed this Labor Condition Application (case number I-200-22157-249853) for a Senior Process Systems/Project Engineer position during fiscal year FY 2022. View all Bechtel Energy Inc. H-1B filings.

What does LCA “Withdrawn” mean?

Certified-Withdrawn means this LCA was initially certified by the DOL but was subsequently withdrawn by the employer or their authorized representative.

Related Guides