WITHDRAWN H-1B FY 2022

Lead, Construction Scheduling

RIVIAN AUTOMOTIVE, LLC · Normal, Illinois

Case #I-200-22084-011050

RIVIAN AUTOMOTIVE, LLC filed an H-1B petition for a Lead, Construction Scheduling position in Normal, Illinois at $175k per year — 99% above the prevailing wage of $88k. The case was processed in 5 days during the FY FY2022 cycle. This position is for continued employment.

$175k
Annual Salary
$88k
Prevailing Wage
+98.8%
Wage Premium
1
Positions

Filing Details

Case NumberI-200-22084-011050
Case StatusWithdrawn
Visa ClassH-1B
Fiscal YearFY 2022
EmployerRIVIAN AUTOMOTIVE, LLC
Employer LocationIrvine, California
Job TitleLead, Construction Scheduling
SOC Code17-205100 – Civil Engineers
WorksiteNormal, Illinois
Annual Wage$175k
Prevailing Wage$88k
Wage Premium+98.8%
Positions1 (0 new, 0 continued)

Timeline

Mar 25, 2022
Received
Mar 30, 2022
Decision
Mar 28, 2022
Employment Start
Mar 27, 2025
Employment End

More Filings from RIVIAN AUTOMOTIVE, LLC

Job TitleSalaryStatusDate
Sr. Staff, Vehicle Line Manager $215k CERTIFIED Sep 9, 2025
Staff Mechanical Design Engineer $171k CERTIFIED Aug 8, 2025
Staff Aero Design Engineer $162k CERTIFIED Jul 30, 2025
Sr. Staff Vehicle Line Manager $212k CERTIFIED Jul 30, 2025
Manager, Exterior Mechanisms $223k CERTIFIED Jul 10, 2025

View all RIVIAN AUTOMOTIVE, LLC filings →

Explore More

About This H-1B Filing

This Labor Condition Application (LCA) was filed by RIVIAN AUTOMOTIVE, LLC for the position of Lead, Construction Scheduling in Normal, Illinois. The offered annual salary is $175k, compared to the prevailing wage of $88k for this occupation and location. This represents a wage premium of +98.8% above the prevailing wage.

The LCA is the first step in the H-1B visa process. Employers must file an LCA with the Department of Labor certifying that they will pay the foreign worker at least the prevailing wage for the occupation in the area of intended employment. A certified LCA is required before the employer can file an H-1B petition with USCIS.

Case status: Withdrawn. This means the employer or their representative withdrew the application.

Understanding This LCA Filing

A Labor Condition Application (LCA) is a mandatory document that U.S. employers must file with the U.S. Department of Labor (DOL) before they can petition for a foreign worker under the H-1B, H-1B1, or E-3 visa categories. The LCA process was established under the Immigration and Nationality Act (INA) to protect both foreign and domestic workers by ensuring fair wages and working conditions.

Why Employers File LCAs

When a U.S. company identifies a foreign national to fill a specialty occupation position, they must first obtain DOL certification through the LCA process before filing the H-1B petition (Form I-129) with U.S. Citizenship and Immigration Services (USCIS). In this case, RIVIAN AUTOMOTIVE, LLC filed LCA case number I-200-22084-011050 to sponsor a Lead, Construction Scheduling position at their worksite in Normal, Illinois. By filing this LCA, the employer attests to four key conditions: (1) paying the higher of the actual wage or prevailing wage, (2) providing working conditions that will not adversely affect other similarly employed workers, (3) no strike or lockout at the worksite, and (4) providing notice of the filing to the bargaining representative or posting notice at the worksite.

What Wage Levels Mean

The DOL establishes four wage levels for each occupation and geographic area, representing the progression from entry-level to fully competent workers:

For this filing, the offered wage of $175k compares to the DOL prevailing wage of $88k for Civil Engineers positions in the Normal, Illinois area. The positive wage premium of +98.8% indicates the employer is offering above the DOL-determined average for this occupation and location.

What is Prevailing Wage?

The prevailing wage is the average wage paid to similarly employed workers in a specific occupation in the area of intended employment. The DOL determines prevailing wages using data from the Occupational Employment and Wage Statistics (OEWS) survey conducted by the Bureau of Labor Statistics (BLS). Employers must pay H-1B workers the higher of the prevailing wage or the actual wage paid to other employees in similar positions at the company. This requirement is designed to prevent employers from using H-1B workers to undercut domestic wages.

How to Interpret This Data

What Withdrawn Means for This Application

A "Certified-Withdrawn" status means this LCA was initially certified by the DOL but was later withdrawn by the employer. This can happen for various reasons: the foreign worker may have declined the position, found employment elsewhere, the employer may have decided to refile with updated information, or business conditions may have changed. A withdrawal does not negatively affect the employer's ability to file future LCAs.

Processing Time

This LCA was received by the DOL on Mar 25, 2022 and a decision was rendered on Mar 30, 2022, a processing time of approximately 5 business days. The standard DOL processing time for LCA applications is 7 to 10 business days. This application was processed within the standard timeframe.

Comparing to Industry Standards

The offered salary of $175k for this Lead, Construction Scheduling position provides a data point for evaluating compensation trends in H-1B visa sponsorship. When reviewing H-1B salary data, consider that wages vary significantly based on geographic location, employer size, industry sector, and the worker's experience level. This position falls under SOC code 17-205100 (Civil Engineers), which standardizes how the Bureau of Labor Statistics classifies occupations across industries. Metropolitan areas like New York, San Francisco, and Seattle typically command higher salaries due to higher costs of living, while positions in smaller markets may offer lower nominal wages but comparable purchasing power.

Frequently Asked Questions

What is the salary for this Lead, Construction Scheduling position?

The offered annual salary for this Lead, Construction Scheduling position at RIVIAN AUTOMOTIVE, LLC is $175k. The Department of Labor prevailing wage for this occupation and location is $88k. The offered wage represents a +98.8% premium over the prevailing wage.

Where is this Lead, Construction Scheduling job located?

This H-1B filing is for a position located in Normal, Illinois. The employing company, RIVIAN AUTOMOTIVE, LLC, is headquartered in Irvine, California.

What visa type is this filing for?

This Labor Condition Application is filed under the H-1B visa classification. The H-1B visa is designed for specialty occupation workers who possess at least a bachelor's degree or equivalent in a specific field related to the job.

Who is the employer for this H-1B filing?

The employer for this filing is RIVIAN AUTOMOTIVE, LLC, located in Irvine, California. RIVIAN AUTOMOTIVE, LLC filed this Labor Condition Application (case number I-200-22084-011050) for a Lead, Construction Scheduling position during fiscal year FY 2022. View all RIVIAN AUTOMOTIVE, LLC H-1B filings.

What does LCA “Withdrawn” mean?

Certified-Withdrawn means this LCA was initially certified by the DOL but was subsequently withdrawn by the employer or their authorized representative.

Related Guides