Secretariat Advisors LLC · El Segundo, California
Case #I-200-25176-129152
In FY2025, Secretariat Advisors LLC sought H-1B sponsorship for a Civil Engineer-Construction Delay Manager in El Segundo, California at $170k per year, which is 30% above the prevailing wage of $131k. The case was certified in 7 days during the FY FY2025 cycle. This position is for continued employment.
| Case Number | I-200-25176-129152 |
| Case Status | Certified |
| Visa Class | H-1B |
| Fiscal Year | FY 2025 |
| Employer | Secretariat Advisors LLC |
| Employer Location | Atlanta, Georgia |
| Job Title | Civil Engineer-Construction Delay Manager |
| SOC Code | 17-205100 – Civil Engineers |
| Worksite | El Segundo, California |
| Annual Wage | $170k |
| Prevailing Wage | $131k |
| Wage Premium | +29.7% |
| Positions | 1 (0 new, 0 continued) |
| Job Title | Salary | Status | Date |
|---|---|---|---|
| Civil Engineer-Construction Delay Manager | $170k | CERTIFIED | Jun 18, 2025 |
| Associate - Construction Delay- Civil Engineer | $105k | CERTIFIED | Jun 2, 2025 |
| Associate | $94k | CERTIFIED | May 30, 2025 |
| Associate - Construction Delay-Civil Engineer | $94k | CERTIFIED | May 29, 2025 |
| Associate - Construction Delay-Civil Engineer | $99k | CERTIFIED | May 29, 2025 |
This Labor Condition Application (LCA) was filed by Secretariat Advisors LLC for the position of Civil Engineer-Construction Delay Manager in El Segundo, California. The offered annual salary is $170k, compared to the prevailing wage of $131k for this occupation and location. This represents a wage premium of +29.7% above the prevailing wage.
The LCA is the first step in the H-1B visa process. Employers must file an LCA with the Department of Labor certifying that they will pay the foreign worker at least the prevailing wage for the occupation in the area of intended employment. A certified LCA is required before the employer can file an H-1B petition with USCIS.
Case status: Certified. This means the Department of Labor has certified that the employer meets the wage and working condition requirements.
A Labor Condition Application (LCA) is a mandatory document that U.S. employers must file with the U.S. Department of Labor (DOL) before they can petition for a foreign worker under the H-1B, H-1B1, or E-3 visa categories. The LCA process was established under the Immigration and Nationality Act (INA) to protect both foreign and domestic workers by ensuring fair wages and working conditions.
When a U.S. company identifies a foreign national to fill a specialty occupation position, they must first obtain DOL certification through the LCA process before filing the H-1B petition (Form I-129) with U.S. Citizenship and Immigration Services (USCIS). In this case, Secretariat Advisors LLC filed LCA case number I-200-25176-129152 to sponsor a Civil Engineer-Construction Delay Manager position at their worksite in El Segundo, California. By filing this LCA, the employer attests to four key conditions: (1) paying the higher of the actual wage or prevailing wage, (2) providing working conditions that will not adversely affect other similarly employed workers, (3) no strike or lockout at the worksite, and (4) providing notice of the filing to the bargaining representative or posting notice at the worksite.
The DOL establishes four wage levels for each occupation and geographic area, representing the progression from entry-level to fully competent workers:
For this filing, the offered wage of $170k compares to the DOL prevailing wage of $131k for Civil Engineers positions in the El Segundo, California area. The positive wage premium of +29.7% indicates the employer is offering above the DOL-determined average for this occupation and location.
The prevailing wage is the average wage paid to similarly employed workers in a specific occupation in the area of intended employment. The DOL determines prevailing wages using data from the Occupational Employment and Wage Statistics (OEWS) survey conducted by the Bureau of Labor Statistics (BLS). Employers must pay H-1B workers the higher of the prevailing wage or the actual wage paid to other employees in similar positions at the company. This requirement is designed to prevent employers from using H-1B workers to undercut domestic wages.
A "Certified" status means the DOL has reviewed Secretariat Advisors LLC's attestations and determined that the LCA meets all regulatory requirements. The employer has demonstrated that the offered wage of $170k meets or exceeds the prevailing wage for Civil Engineer-Construction Delay Manager positions in the El Segundo, California area. It is important to understand that LCA certification does not guarantee H-1B visa approval. The next step is for the employer to file Form I-129 with USCIS, which evaluates whether the position qualifies as a specialty occupation and whether the beneficiary has the required qualifications.
This LCA was received by the DOL on Jun 25, 2025 and a decision was rendered on Jul 2, 2025, a processing time of approximately 7 business days. The standard DOL processing time for LCA applications is 7 to 10 business days. This application was processed within the standard timeframe.
The offered salary of $170k for this Civil Engineer-Construction Delay Manager position provides a data point for evaluating compensation trends in H-1B visa sponsorship. When reviewing H-1B salary data, consider that wages vary significantly based on geographic location, employer size, industry sector, and the worker's experience level. This position falls under SOC code 17-205100 (Civil Engineers), which standardizes how the Bureau of Labor Statistics classifies occupations across industries. Metropolitan areas like New York, San Francisco, and Seattle typically command higher salaries due to higher costs of living, while positions in smaller markets may offer lower nominal wages but comparable purchasing power.
The offered annual salary for this Civil Engineer-Construction Delay Manager position at Secretariat Advisors LLC is $170k. The Department of Labor prevailing wage for this occupation and location is $131k. The offered wage represents a +29.7% premium over the prevailing wage.
This H-1B filing is for a position located in El Segundo, California. The employing company, Secretariat Advisors LLC, is headquartered in Atlanta, Georgia.
This Labor Condition Application is filed under the H-1B visa classification. The H-1B visa is designed for specialty occupation workers who possess at least a bachelor's degree or equivalent in a specific field related to the job.
The employer for this filing is Secretariat Advisors LLC, located in Atlanta, Georgia. Secretariat Advisors LLC filed this Labor Condition Application (case number I-200-25176-129152) for a Civil Engineer-Construction Delay Manager position during fiscal year FY 2025. View all Secretariat Advisors LLC H-1B filings.
Certified means the U.S. Department of Labor has approved this Labor Condition Application, confirming that Secretariat Advisors LLC has attested to meeting all wage and working condition requirements. A certified LCA does not guarantee H-1B visa approval — the employer must still file a separate petition (Form I-129) with USCIS.